ConstructionBoth the constructability and long term integrity of gas, LNG and petrochemical plants can be significantly improved using our unique products FibaRoll and FibaShield. The end result of this specification upgrade is a project completed more easily and with lower life-cycle costs.
ConstructabilityAll of our products combine fibre reinforcement and resilient polymers to deliver outstanding mechanical and flexural strength. In fact, the mechanical strength of FibaRoll and FibaShield cladding is such that vessels and piping can be insulated and clad prior to construction, in a workshop or on the ground close to site. This pre-finishing approach has many benefits, including:
up to 80% reduction in hours onsite, often at a height, with consequent benefits
Because vessels and piping can be pre-insulated and stored, the normal construction schedule can be planned more effectively. For example, jetty piping can be pre-insulated before jetty piling is even started. This effectively completes a step (insulation/cladding of jetty piping) in the body of the project rather than at the end. By using this facility a project's Critical Path can be improved.
Long term integrityThis is significantly improved by pre-insulation both of vessels and piping. The primary risk for long term integrity of process plants is external corrosion, and this is particularly the case with Corrosion under Insulation, "CUI". Pre-insulation reduces the risks of CUI by the following:
because the pipe or vessel is pre-insulated and clad with a mechanically strong
In conclusion, selection of the FibaRoll and FibaShield systems for pre-insulation of vessels and piping delivers valuable benefits - both in the construction and ownership phases of many projects. |
|||||